IME Life New

An autism school and research center to be established in Kathmandu

SPIL
Nepal Life

समाचार सुन्नुहोस्

Kathmandu. An autism school and research center is set to be established in Kathmandu.

Kathmandu Metropolitan City has planned to construct the Autism School and Research Center building. The building will be constructed in Anamnagar (to the east of the current Ward No. 29 office building).

Esewa
Crest

This building will have five floors. It will have ample open spaces and a well-equipped elevator capacity of 8 people, while the first, second, and third floors will house the Autism School, while the fourth floor will house the administrative unit and an autism-related research center.

This building will have an elevator, a disabled-friendly ramp, and a restroom. The construction of this building will be carried out by Equuhpath Construction.

The initial construction cost of the hall of the building is estimated to be 97,745,626 rupees. The construction is scheduled to begin on Mangsir 3, 2083, and be completed by the end of Chaitra.

Kathmandu Metropolitan City has stated that experts have been consulted at various times regarding the building’s construction.

प्रतिक्रिया दिनुहोस्

यो खबर पढेर तपाईंलाई कस्तो महसुस भयो ?

0%
happy

खुसी

0%
sad

दु :खी

0%
amazed

अचम्मित

0%
excited

उत्साहित

0%
angry

आक्रोशित

LICn

सम्बन्धित समाचार

Insurance Khabar Mobile App Android and IOS