IME Life New

Upper Mai Hydropower Project in operation

SPIL
Nepal Life

समाचार सुन्नुहोस्

Kathmandu. The 9.98 MW Upper Mai Hydropower Project, operated by the Panchakanyamai Hydropower Company, has come into operation. Due to excessive water leakage in the expansion joint of this project, the tunnel had to be completely emptied for maintenance, due to which the production of electricity was stopped from the evening of September 7.

After repairing the problem, the 9.98 MW Upper Mai Hydropower Project has come into operation from October 30.

Esewa
Crest

प्रतिक्रिया दिनुहोस्

यो खबर पढेर तपाईंलाई कस्तो महसुस भयो ?

0%
happy

खुसी

0%
sad

दु :खी

0%
amazed

अचम्मित

0%
excited

उत्साहित

0%
angry

आक्रोशित

LICn
Vianet

सम्बन्धित समाचार

Insurance Khabar Mobile App Android and IOS