{"id":313483,"date":"2026-08-30T11:34:58","date_gmt":"2026-08-30T05:49:58","guid":{"rendered":"https:\/\/insurancekhabar.com\/?p=313483"},"modified":"2026-08-30T11:40:04","modified_gmt":"2026-08-30T05:55:04","slug":"rescue-of-people-trapped-in-trishuli-3-a-hydropower-project-2","status":"publish","type":"post","link":"https:\/\/english.insurancekhabar.com\/rescue-of-people-trapped-in-trishuli-3-a-hydropower-project-2\/","title":{"rendered":"Rescue of people trapped in Trishuli 3 &#8216;A&#8217; hydropower project"},"content":{"rendered":"<p>Kathmandu. The government has made continuous efforts for the people trapped in the Upper Trishuli 3 &#8216;A&#8217; hydropower project due to the Rasuwa floods. The government continued the rescue operation throughout last night. <\/p>\n<p>However, due to the flood that occurred again at the project site at around 4 am today, the water level of the Trishuli river has increased by 5 to 10 meters. As the water level of the river has increased excessively, it has started cutting the bank of the project area rapidly. However, the government is again preparing to mobilize dozers and heavy equipment to remove the soil and mud after observing the overall damage and situation of the project area with full vigilance. <\/p>\n<p>Similarly, the government is preparing to mobilize a &#8216;special force&#8217; through helicopters to safely remove the 19 CCTV cameras, HDR and setup boxes that control the tunnel portal and power house of Trishuli 3 &#8216;A&#8217;, which was buried by landslides and mud. Due to the obstruction of road access, preparations are being made to land a team from a helicopter near the buried building and retrieve the critical equipment.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kathmandu. The government has made continuous efforts for the people trapped in the Upper Trishuli 3 &#8216;A&#8217; hydropower project due to the Rasuwa floods. The government continued the rescue operation throughout last night. However, due to the flood that occurred again at the project site at around 4 am today, the water level of the [&hellip;]<\/p>\n","protected":false},"author":16,"featured_media":312832,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[45159],"tags":[],"class_list":["post-313483","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/posts\/313483","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/comments?post=313483"}],"version-history":[{"count":1,"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/posts\/313483\/revisions"}],"predecessor-version":[{"id":313484,"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/posts\/313483\/revisions\/313484"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/media\/312832"}],"wp:attachment":[{"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/media?parent=313483"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/categories?post=313483"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/insurancekhabar.com\/ikbrapi\/wp\/v2\/tags?post=313483"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}